Water Update for Week Ending 5/31/19

Lots of Rain impeding progress!!!

However, we are only 100 ft. from new water tank location on Cliff St.  Installed 305 ft of PVC Pipe through grass and wooded area by wetland.

At Bloom St. connections for valves and fire hydrants on HDPE Pipe using heat fusion and electro-fusion.  The concrete for foundation at the tank site was poured and is curing, next week back filling and the base  will be poured

The workers of G. DeVincentis would like to thank the people of Gilbertsville for being so patient and kind!!!!  "This Village is AWESOME!"