Cliff St. 534 ft. of 10" PVC pipe and appurtenances in ground. At the wetlands, getting close to the Water Tank.
Bloom St. 559 Ft. of HDPE Pipe (drilled and appurtenances).
Tank Site. The forms for the foundation almost finished being installed and concrete should be poured next week weather permitting.