Week of 6/17 - 6/21

Drill crew drilling for 500 ft of HDPE pipe on Spring St.
Other crew installing cluster of valves at commercial st. And running new 8" PVC line down Elm St. And installing new fire hydrant on Elm St.
Bottom of water tank base is poured.