Sunday, August 25, 2019

Water Project Update for Week Ending 8/23/2019


Report for week of 8/19 - 8/23

Installed fire hydrants on Vine St, Spring St, maple and Grove St. For a total of 4 fire hydrants. Pressure and flow is very good on these hydrants.
The main line crew has been installing 8" and 16" water main on Sylvan and Grove going into new Treatment building.
Blacktop crew has been doing blacktop restoration on Cliff St and Rt.51.
We have been continuing flushing, pressure testing and bacteriological testing on new water mains.