Sunday, July 21, 2019

Water Project Update for Week Ending 7/19/2019

Water line update for 7/15 - 7/19

Drilling of 8" water line is complete on Bloom St. about 340 ft of HDPE pipe was installed.
Also on NYS Rt 51 about 250 ft of 8" PVC pipe was installed along with all appurtenances (valves,bends etc.) also a new hydrant was installed on Commercial St. By the post office.
More water main is planned to be installed next week on NYS Rt 51. Both drilling and open cut will be used for installing water mains.

Plus Richard Gilbert (DPW) filled the new tank with water and it's ready for flushing out the new mains and then pressure testing and sterilization.

No comments:

Post a Comment